The engineer and management disagree
Contractor engineerEngineer entry
99.96%
Probability of O-ring distress at 31°F. Logged at 20:00, before management processing.
Contractor managementManager entry
12%
Transmitted to the agency as GO at 22:30. Simulated override.
The red tick marks the 13% threshold. The agency model independently reads 99.96%.
Chosen:
Added to the audit log as entry #6, along with which evidence panels were open. The escalation status and divergence flag stay as logged.
Options are illustrative and need checking against the historical record before use.
Supporting evidence
Everything behind the decision is one click away. The log records which panels were open when a choice is made.
Contractor engineerEngineer entry
99.96%
20:00. Before management processing.
Contractor managementManager entry
12%
22:30. Transmitted to the agency as GO.
Agency telemetryRisk Monitor Agent
99.96%
20:02. O-ring model output, computed independently.
- Engineer signal above thresholdYes
- Management transmission at or below thresholdYes
When both are true, escalation is triggered regardless of what management transmitted.
Trend detection
Looks for a rising signal that has not yet crossed the threshold. Tonight the signal is already over it.
Slope [x], p [x], last [N] flights
Resolution audit
Checks whether mixed signals keep resolving toward proceeding.
Proceed [n] of [N], binomial p [x]
Bracketed values are placeholders for the O-ring dataset results.